Upcoming road works Fulbourn

27/06/2024 – 10/07/2024.

  • Cherry Orchard.
  • Permit number: KG079-D1-CB23-PN7-01-01.
  • City Fibre. Works throughout street to excavate and lay ducting for BDUK installation scheme.
  • Junction of High Street, Church Lane, School Lane and Manor Walk.
  • Permit number: KG079-D1-CB23-PN2-05-03, KG079-D1-CB23-PN2-02-03 & KG079-D1-CB23-PN2-03-03
  • City Fibre works to excavate and lay ducting for the BDUK fibre project. Works will take place between 08:00 – 18:00 all other times the carriageway will be clear.
  • Between 37 – 43 Pierce Lane.
  • Permit number: CK001D3106257OCL-02
  • Cambridge Water. Road closure required to complete new connection to a new dwelling.

19/08/2024 – 23/08/2024

  • 55 School Lane. Between Cambridge Road and Doggett Lane.
  • Permit number: CK001D2676089OCL-06
  • Cambridge Water. Road closure required of Doggett Lane/School Lane to complete road crossing to replace lead service pipe.

Back to top